Independent community page covering news, public documents, local impacts, and discussion related to Micron’s proposed semiconductor project in Clay, NY. Not affiliated with, endorsed by, or sponsored by Micron Technology, Inc.
4K Night Time Drone Footage of the Micron Technology site in Clay, NY. Please Subscribe To, Like, and Share our YouTube channel as that is our primary place to post videos! @followers Taken on November 10th, 2026.
Experience night time drone footage of the @MicronTechnology and @b...
With Thanksgiving weekend here, I thought I'd ask everyone something a little different.
We've spent a lot of time talking about construction, permits, jobs, and all the changes coming with Micron Technologys project in Clay.
But I'm curious what everyone is actually hoping to see come out of all this.
Maybe it's more good-paying jobs, opportunities for our kids to stay in Central New York, growth for local businesses, or improvements to infrastructure.
Or maybe there's something else you'd really like to see happen as a result of this investment.
Whether you're excited about the project, have concerns, or fall somewhere in between, I'd be interested to hear what you're hoping for.
What's one thing you'd like to see come out of Micron's investment in Central New York?
Micron News in Clay, NY – Unofficial / Unaffiliated. A project by ITM0nkey.
I hope everyone has a wonderful Thanksgiving! I have plenty to be thankful for, including all of you folling me on this journey. I hope you day is filled with tons of food, preferably followed by a nice long nap. @topfans
New DRAM Memory Technology Being Developed at Albany NanoTech
Some interesting semiconductor research news out of Albany that could be relevant to the future of memory chips.
NY CREATES shared an announcement yesterday from AlixLabs, a Swedish semiconductor technology company working on new ways to manufacture smaller and more advanced memory chips.
The company recently completed testing at the Albany NanoTech Complex, where researchers were able to reduce the diameter of tiny openings used in semiconductor manufacturing from 25.3 nanometers to just 17.1 nanometers, a reduction of about 32%.
To put that into perspective, these openings are already thousands of times smaller than a human hair.
One thing worth clarifying is that the 32% reduction doesn't mean the memory chips themselves are 32% smaller, or that they'll have 32% more capacity. It's the size of these individual features that researchers were able to reduce.
The idea is that making these structures smaller and more precise could eventually allow manufacturers to fit more memory into the same amount of space.
That could be useful as demand for more advanced memory continues growing, especially with AI placing increasing demands on both processing power and memory capacity.
It's still early research, though, and there's a difference between successfully demonstrating a process in a research facility and getting it ready for mass production.
There's also a local connection worth mentioning.
Micron is already involved in semiconductor research and development efforts at Albany NanoTech, while preparing to build its massive memory manufacturing complex in Clay.
There's no indication Micron was involved in this particular project or that the technology will eventually be used at its Clay fabs.
Still, it's interesting to see some of the research happening elsewhere in New York that could help shape future generations of memory technology.
You can find the November 24 announcement on the NY CREATES website or by searching for "AlixLabs Advanced Via Patterning DRAM." Unfortunately, Facebook is currently restricting my ability to share direct links.
Micron News in Clay, NY – Unofficial / Unaffiliated. A project by ITM0nkey.
Canadian Steel Company Reportedly Lands $602 Million Contract for Micron's Clay Project
Some interesting news out of Canada that may be connected to Micron's project in Clay.
ADF Group, a steel fabrication company based in Quebec, announced on November 19 that it had landed the largest contract in its 70-year history, worth C$602 million (Canadian dollars).
The contract is for structural steel for a large technology manufacturing facility in the northeastern United States. ADF hasn't named the customer, but Canadian newspaper Le Journal de Montréal reports that it's for Micron's semiconductor project in Clay. ADF wouldn't confirm that when asked.
The amount of steel involved is pretty substantial. ADF expects production at its Quebec facility to reach as much as 4,000 metric tons per month, with the work spread over roughly 18 months and continuing into 2028.
The company is also spending another C$10 million to expand its production capacity, including new equipment and additional space for applying protective coatings. Much of the steel fabrication will be done using automated machinery.
One thing I found particularly interesting is the construction timeline.
ADF describes this as a fast-track project, with a pretty demanding production schedule. If the contract is for Micron, having all that steel manufactured in Quebec while crews continue working on foundations and other parts of the site in Clay could help keep construction moving.
The steel could then be shipped here as different sections of the building are ready for assembly, rather than waiting for fabrication work to happen on-site.
Micron and Bechtel have already discussed using modular construction and other methods to make the building process more efficient. Micron also reported that its first concrete pour in July happened more than three months ahead of the original schedule.
It makes me wonder whether this contract is another part of that approach. That's not to say Micron is moving up its completion date, but it could help explain how they're planning to keep such a large project on schedule.
Another interesting detail is that ADF says the customer will cover applicable U.S. tariffs on the steel. That means those additional costs won't be coming out of the Canadian company's end of the deal.
For now, the contract itself is confirmed, but the connection to Micron is still based on the Canadian newspaper's reporting. Neither company has publicly confirmed it.
Still, if it is for Clay, that's a substantial amount of work being lined up while construction here is still largely focused on foundations and site preparation.
You can find ADF Group's November 19 announcement on its website, along with the Canadian reporting by searching for "Le Journal de Montréal ADF Micron." Unfortunately, Facebook is currently restricting my ability to share direct links without paying large monthly fees
Micron News in Clay, NY – Unofficial / Unaffiliated. A project by ITM0nkey.
New York Could Tighten PFAS Water Standards — What Does That Mean for Micron?
New York lawmakers and environmental groups are pushing Governor Hochul to sign a bill that would tighten the state's drinking water limits for PFAS, often called "forever chemicals."
The bill (S3207B) passed both houses unanimously back in June, but still hasn't been signed.
Right now, New York allows up to 10 parts per trillion (ppt) of PFOA and PFOS in public drinking water. The bill would lower both limits to 4 ppt and establish a 10 ppt limit for three additional chemicals: PFNA, PFHxS, and GenX.
It would also require the state Department of Health to look at the potential health effects of exposure to multiple PFAS chemicals together, rather than evaluating each one separately. Public water suppliers would have until May 2029 to meet the new standards.
The timing isn't a coincidence. The federal EPA is proposing to give some water systems until 2031 to comply with federal PFAS requirements and eliminate drinking water limits for several other PFAS chemicals.
The EPA points to expensive treatment upgrades, rising construction costs, and staffing shortages as reasons for the proposed delays. Environmental groups argue that pushing back the deadlines would leave people exposed to contamination longer.
So why hasn't Hochul signed it? There's no confirmed explanation, although concerns have been raised about the cost to water suppliers and whether specific drinking water standards should be set through legislation or the state's normal regulatory process.
So where does Micron fit into this?
For starters, OCWA would have to meet the new standards, just like other public water suppliers. Whether that requires additional treatment would depend on its existing water quality and treatment systems.
There's also the wastewater side of things. Micron's future manufacturing operations could generate wastewater containing PFAS, which would be treated through the expanded Oak Orchard Wastewater Treatment Plant before being reused or discharged into the Oneida River.
Oak Orchard's current permit already requires PFAS monitoring, with action levels of 10 ppt for PFOA and PFOS. Those are monitoring thresholds, though, not enforceable numerical discharge limits.
The drinking water bill wouldn't directly change Oak Orchard's permit. However, there's another bill awaiting Hochul's signature, the PFAS Discharge Disclosure Act (S4574B), that could expand PFAS testing and public reporting requirements for certain industrial facilities and wastewater treatment plants, potentially including Micron and Oak Orchard.
Neither bill has been signed yet, so the existing requirements remain in place.
It'll be worth following what happens with both bills, especially as Micron's project moves forward and actual wastewater testing results become available.
Sources: NYS Senate bills S3207B and S4574B, NYSDEC, EPA, and Environmental Advocates NY.
Micron News in Clay, NY — Unofficial / Unaffiliated. A project of ITM0nkey.
Independent coverage of Micron's Clay project. Not affiliated with Micron Technology, Bechtel, or any government agency.
35 postings added to the tracker this week: 19 from Bechtel and 16 from other employers. No new Micron-direct postings.
Bechtel – 19 postings:
A/P Lead – $91K–$138.8K
Project Controls Manager – $119.8K–$182.7K
Lead Cost Engineer – $105K–$160.2K
DBRA/OCIP Specialist – $78K–$119K
CAD Drafter - CUB / TRESTLE – $78.9K–$120.3K
Safety Specialist II (2 postings) – $72K–$109.8K each
Lead Equipment Superintendent – $105K–$160.2K
Deputy Project Field Engineer - Night – $119.8K–$182.7K
Lead Indirects Superintendent – $123.4K–$178.5K
Deputy Area Manager - HPM – $119.8K–$182.7K
Project Accountant - A/P – $106.9K–$154.7K
Deputy F&A Manager – $119.8K–$182.7K
Incident Investigator II – $72K–$109.8K
PIIM BIM Coordinator – $91K–$138.8K
Field Buyer – $72K–$109.8K
Workface Planner – $91K–$138.8K
Workface Planner, separate posting – $78K–$119K
Supply Chain Supervisor – $119.8K–$182.7K
Heidelberg Materials – 8 postings for the Micron project:
QC Tech – $64.5K–$77K
Laborer – $38–$40/hour
Mobile Equipment Mechanic – $33–$39.85/hour
Loader Operator – $101.9K–$108.2K
Plant Maintenance Mechanic – $49–$52/hour
Batch Plant Operator – $101.9K–$108.2K
Ready Mix Driver – $30–$39.70/hour
Ready Mix Concrete QC Supervisor – posting lists conflicting ranges: $75,410–$100,549.99 and $94,265–$111,235
Other regional listings – 8 postings:
Knowles – Process Engineer - Sputter Deposition – $70K–$105K
Central Current – Editor-in-Chief – $70K–$85K
Central New York Community Foundation – Financial Analyst – $75K–$80K
Jacobs – Senior BIM Specialist | Digital Delivery | Data Centers – pay unavailable
Arcadis – Senior Architect – $125K–$160K
Jacobs – Senior Electrical Designer (Semiconductor) – $80.6K–$148.6K
Jacobs – Senior Civil Design Engineer (Data Centers) – $132.9K–$174.4K
Linde Gas & Equipment – Local Delivery Driver (CDL A or B) – pay unavailable
These are new to the tracker this week. Some were posted earlier.
#MicronTechnology #bechtelcorp #technology #CNY #Semiconductor
Micron Jobs Update Monday Micron Technology Bechtel Corporation #technology #CNY #Semiconductor @topfans
Exploring the New Crouse Health Harborview Aquarium: A Drone's Eye View
Experience 4K drone footage of the Crouse Health Harborview Aquarium. See this Syracuse NY landmark from a unique aerial view.
This video provides a comprehensive look at the aquarium exterior and its prominent waterfront location. The footage is ideal for those interested in the architecture and surrounding geography of this facility in Central New York.
Captured in full resolution, the video showcases the site layout and the scale of the building. This aerial drone footage serves as a clear visual record of the property and its integration into the local area.